PUBLICATION

Geosystems Laboratory

Conference articles

Study on Effects of Disc Cutter Sensors’ Arrangement on Electrical Resistivity Survey
Journal
The 2016 World Congress on Advances in Civil, Environmental, and Materials Research (ACEM16)
Author
Hong, Chang Ho, Jin, Gyu-Nam, Cho, Gye-Chun, Ryu, Hee-Hwan, Kim, Kyoung-Yul, Lee, Dae-Soo
Year
2016
Date
20160831

​ABSTRACT 


Expectation of rapid change of ground in tunnel boring machine is difficult because tunnel face is not revealed. Probe drilling, tunnel seismic prediction (TSP), and tunnel electrical resistivity prospecting system (TEPS) are widely used TBM ahead prediction method. TEPS takes shortest time among these methods and has no influence on ground. In this study, disc cutter of TBM is utilized as sensor of TEPS and experimental test for checking influence of disc cutter spacing and contact area between disc cutter and ground.